Level 4 & Level 5 Testing

Automated Heat Runs & IST Script Execution.

The test doesn't end when the load banks turn off; it ends when the data is validated. We write bulletproof L4/L5 execution scripts and use custom Python automation to turn millions of telemetry rows into instant pass/fail reports.

L0: Plan
L1: FAT
L2: SAT
L3: Startup & PFC
L4: FPT
L5: IST
L6: Handover

Focus Area: L4 Functional, L5 IST & L6 Handover

0 Days

Spent in Excel

Level 5

IST Integration

"Agencies charge you for a week of 'Documentation' after a heat run. We run your raw CSV files through our proprietary data validation engine and give you the Delta-T graphs in seconds."

Strategy & Layout Audit

Ensure your physical load bank layout and test steps won't fail the client's criteria.

€1,200 /Test Plan
  • Floor layout & cable sizing review
  • Phase balancing & step-load checks
  • Red-line of L4/L5 step sequences
  • Script authoring
  • Post-test data processing
Most Popular

L4/L5 Script Authoring

We write the complex failure scenarios and step-by-step execution scripts.

€3,800 /Test Suite
  • Everything in Audit, plus:
  • Complete L4 Heat Run authoring
  • L5 IST failure scenario mapping
  • Expected system response definitions
  • BMS trend log requirement lists
  • Automated data parsing

The Automation Engine

Scripting + our proprietary Python validation. We parse your raw logs into client-ready reports.

€7,500 /Project
  • Everything in Scripting, plus:
  • Post-test Python data ingestion
  • Automated Delta-T (ΔT) graph generation
  • Voltage anomaly & EN 50160 flagging
  • Handover-ready PDF reports in 24 hours

Retire the Clipboard

If your commissioning team is spending days after a test manually aligning timestamps from 20 different USB sticks, you are bleeding profit. By applying basic software engineering principles to MEP data, we condense a week of reporting into seconds, giving you the fastest path to site handover.

L6

Level 6: Managed Handover to Operations

Most project delays occur in the final 5% of the schedule. We facilitate the "Level 6" transition by ensuring all BMS trend logs, protective device settings, and O&M manuals are digitally validated and ready for the FM team.

Securing your retention release.