Level 1-3 Quality Control

Zero-Snag Handovers: Engineered from Day One.

Rework is the enemy of profit. We build comprehensive Project Quality Plans (PQP) and Inspection & Test Plans (ITPs) that align your site teams exactly with hyperscale client expectations.

L0: Plan
L1: FAT
L2: SAT
L3: Startup & PFC
L4: FPT
L5: IST
L6: Handover

Focus Area: L2 Site Acceptance & Quality Control

L1 ➔ L3

Full Lifecycle

EN/IEC

Standard Compliant

"We bridge the gap between installation and integrated testing. If the L1/L2 foundations are flawed, the L5 IST will fail. We don't let that happen."

ITP Audit & Align

Ensure your drafted Inspection & Test Plans meet the client's strict QA standards.

€750 /ITP
  • Cross-check with client specifications
  • Witness & Hold point verification
  • Testing standard alignment (EN/IEC)
  • Full ITP authoring
  • Project Quality Plan (PQP) creation
The Standard

The Master PQP & ITPs

We author your complete Project Quality Plan and custom ITP suite.

€3,200 /System Pkg
  • Everything in Audit, plus:
  • Custom Project Quality Plan (PQP)
  • Authoring of Level 1, 2 & 3 ITPs
  • Formatted snagging & punch-list workflows
  • 1 revision round post-client comments
  • Remote site-walk / Snag management

Virtual QA/QC Manager

Your dedicated, remote QA Lead. We defend the ITPs and manage the snag list.

€6,000 /Month
  • Everything in The Master PQP, plus:
  • Remote attendance in client QA/QC meetings
  • Weekly remote snag-list reviews & strategy
  • Review of completed L1/L2 checklists
  • Pushback against unfair client snags

The Cost of "We'll Fix It Later"

When sub-contractors speed through Level 1 installations without rigid ITPs, the bill comes due at Level 3. Re-terminating cables or moving containment because it failed a visual inspection destroys your schedule. We build the "right-first-time" culture into your documentation before a single tool is lifted.